黑人巨大vs小早川怜子,久久精品国产亚洲AV下载软件,日韩黄片一区二区,久久3

銷售咨詢熱線
15953126901
18615254757
公司新聞 hengye
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟南燕翔鐵藝制品有限公司
  • 手機:15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
當(dāng)前位置: 首頁 > 新聞資訊>公司新聞輕型鋼結(jié)構(gòu)常見質(zhì)量事故及原因分析!

輕型鋼結(jié)構(gòu)常見質(zhì)量事故及原因分析!

來源:http:// 日期:2020-07-10 發(fā)布人: 瀏覽次數(shù):64
  鋼結(jié)構(gòu)的抗拉、抗壓強度相對較高,構(gòu)件斷面小,自重較輕,結(jié)構(gòu)性能好,建設(shè)速度快,環(huán)境污染小,所以鋼結(jié)構(gòu)工程適用多種結(jié)構(gòu)形式和場所。今天濟南輕型鋼結(jié)構(gòu)總結(jié)了輕型鋼結(jié)構(gòu)工程常見質(zhì)量事故以及事故原因,一起來看吧。
  The tensile and compressive strength of steel structure is relatively high, the member section is small, the weight is light, the structural performance is good, the construction speed is fast, and the environmental pollution is small, so the steel structure engineering is suitable for a variety of structural forms and places. Today, Jinan light steel structure summarizes the common quality accidents and accident causes of light steel structure engineering, let's see together.
  輕型鋼結(jié)構(gòu)工程常見質(zhì)量事故
  Common quality accidents of light steel structure engineering
  01
  01
  網(wǎng)架工程常見質(zhì)量事故
  Common quality accidents in grid structure engineering
 ?。?)桿件彎曲變形或局部斷裂;
  (1) The bending deformation or local fracture of the bar;
 ?。?)桿件封板或錐頭焊縫連接破壞;
  (2) The connection of sealing plate or cone head weld is damaged;
 ?。?)節(jié)點變形或斷裂;
  (3) The joint is deformed or fractured;
  (4)焊縫不飽滿或有氣泡、夾渣、微裂縫超過規(guī)定標(biāo)準(zhǔn);
  (4) The weld is not full or there are bubbles, slag inclusion and micro cracks, which exceed the specified standard;
 ?。?)高強螺栓斷裂或從球節(jié)點中拔出;
  (5) The high strength bolt is broken or pulled out from the ball joint;
 ?。?)桿件在節(jié)點相碰,上弦支撐時支座腹桿與支承結(jié)構(gòu)相碰;
  (6) The members collide at the nodes, and the web member of the support collides with the supporting structure when the upper chord is supported;
  (7)支座節(jié)點位移;
  (7) The displacement of bearing node;
 ?。?)網(wǎng)架撓度過大,超過了設(shè)計規(guī)定相應(yīng)設(shè)計值的1.15倍。
  (8) The deflection of the grid is too large, which exceeds 1.15 times of the corresponding design value specified in the design.
                                                 濟南輕型鋼結(jié)構(gòu)
  02
  02
  門式剛架工程常見質(zhì)量事故
  Common quality accidents in portal frame engineering
 ?。?)主要構(gòu)件變形、扭曲;
  (1) Deformation and distortion of main components;
 ?。?)預(yù)埋件不符圖紙、規(guī)范要求,高差超標(biāo),間距超標(biāo);
  (2) The embedded parts do not meet the requirements of drawings and specifications, the height difference exceeds the standard, and the spacing exceeds the standard;
 ?。?)鋼架整體垂直度和整體平面彎曲超差,梁柱端板孔位不對應(yīng),大小錯位;
  (3) The overall perpendicularity and overall plane bending of the steel frame are out of tolerance, and the hole positions of beam and column end plate are not corresponding, and the size is misplaced;
 ?。?)主要受力節(jié)點焊縫不飽滿或有氣泡、夾渣、微裂縫超過規(guī)定標(biāo)準(zhǔn)等;
  (4) The weld seam of the main load-bearing joints is not full or there are bubbles, slag inclusion and microcracks exceeding the specified standard;
 ?。?)附屬穩(wěn)定結(jié)構(gòu)如:支撐、系桿、隅撐等位置不合理、或加工錯誤;
  (5) Auxiliary stable structures such as: unreasonable position of support, tie bar and corner brace, or wrong processing;
 ?。?)次要構(gòu)件不符合質(zhì)量要求。
  (6) Secondary components do not meet the quality requirements.
  主要原因
  main cause
  01
  01
  設(shè)計原因
  Design reasons
 ?。?)結(jié)構(gòu)形式選擇不合理,桿件截面匹配不合理,忽視構(gòu)件初彎曲、初偏心和次應(yīng)的影響,設(shè)荷載低算和漏算或荷載組合不當(dāng);
  (1) The results show that the selection of structural form is unreasonable, the cross-section matching of members is unreasonable, the influence of initial bending, initial eccentricity and secondary stress of members is ignored, and the load calculation is low or omitted or the load combination is improper;
 ?。?)材料選擇不合理;
  (2) The material selection is unreasonable;
 ?。?)計算方法選擇、假設(shè)條件、電算程序有誤未能發(fā)現(xiàn);
  (3) There are errors in the selection of calculation methods, assumptions and computer programs;
 ?。?)結(jié)構(gòu)設(shè)計計算后,不經(jīng)復(fù)核就進(jìn)行材料代換,導(dǎo)致超設(shè)計值強度構(gòu)件出現(xiàn);
  (4) After structural design and calculation, material replacement is carried out without review, resulting in the appearance of strength components beyond the design value;
 ?。?)圖紙錯誤或不全。如尺寸標(biāo)注混亂,設(shè)計說明不清,對材料、工藝要求、施工程序及特殊要求部位有遺漏;
  (5) The drawing is wrong or incomplete. For example, the dimensions are confused, the design description is not clear, and there are omissions in materials, process requirements, construction procedures and special requirements;
 ?。?)節(jié)點構(gòu)造有誤,細(xì)部考慮不。
  (6) The node structure is wrong, and the detailed consideration is not comprehensive.
  02
  02
  加工原因
  Processing reason
 ?。?)管理混亂,不同規(guī)格、鋼號、材質(zhì)材料混雜使用;
  (1) Management confusion, different specifications, steel grades, materials mixed use;
 ?。?)構(gòu)件下料尺寸有誤,構(gòu)件長細(xì)比不符設(shè)計要求;
  (2) The cutting size of the component is wrong, and the slenderness ratio of the component does not meet the design requirements;
  (3)網(wǎng)架桿件剖口未打、對接時焊縫不加襯管或不按設(shè)計要求焊接;
  (3) When the grid member is not cut, the welding seam is not lined or welded according to the design requirements;
 ?。?)連接高強螺栓不合格;
  (4) The high-strength bolts are unqualified;
 ?。?)構(gòu)件加工有缺陷,螺栓球孔角度偏差大;
  (5) There are defects in the processing of components, and the angle deviation of bolt ball hole is large;
 ?。?)焊縫質(zhì)量差,焊角尺寸未達(dá)到設(shè)計要求。
  (6) The weld quality is poor, and the fillet size does not meet the design requirements.
  03
  03
  網(wǎng)架安裝原因
  Reasons for grid installation
 ?。?)地面拼裝時支撐點不均勻,受力不合理,拼裝時誤差積累,個別桿件錯誤,導(dǎo)致受力改變,造成網(wǎng)架或個別桿件變形。
  (1) During the ground assembly, the support points are not uniform, the force is unreasonable, the error accumulation during assembly, and the error of individual members leads to the change of stress, resulting in the deformation of grid structure or individual members.
 ?。?)焊接工藝、焊接順序有誤,產(chǎn)生焊接應(yīng)力,導(dǎo)致變形。
  (2) Welding process and welding sequence are wrong, resulting in welding stress and deformation.
 ?。?)整體吊裝時,吊點選擇不合理,沒有對吊點進(jìn)行反力驗算、桿件超應(yīng)力驗算、撓度驗算、對超應(yīng)力處進(jìn)行必要加固措施。
  (3) In the integral hoisting, the selection of lifting point is unreasonable, and there is no counter force checking calculation, bar overstress checking calculation, deflection checking calculation and necessary reinforcement measures for the over stress part.
 ?。?)整體吊裝時,各吊點起升速度不同,位移、高差超過允許范圍,導(dǎo)致變形、破壞。
  (4) During the integral hoisting, the lifting speed of each lifting point is different, and the displacement and height difference exceed the allowable range, resulting in deformation and damage.
 ?。?)施工方案選擇錯誤,沒有根據(jù)網(wǎng)架結(jié)構(gòu)形式、現(xiàn)場施工條件合理選擇方案,安裝時不能形成幾何不變體系,導(dǎo)致變形、破壞。
  (5) The selection of construction scheme is wrong, and the scheme is not reasonably selected according to the grid structure form and site construction conditions, and the geometric invariant system cannot be formed during installation, resulting in deformation and damage.
 ?。?)網(wǎng)架支座預(yù)埋件、預(yù)埋螺栓或柱頂偏移較大,就位困難,強迫就位,導(dǎo)致改變支座受力條件,桿件變形。
  (6) The displacement of embedded parts, embedded bolts or column top of grid support is large, so it is difficult to put them in place, which leads to change of bearing stress conditions and deformation of members.
 ?。?)安裝人員粗心大意,桿件位置、球角度有誤。
  (7) The installation personnel is careless, and the position of the rod and the angle of the ball are wrong.
 ?。?)上弦支撐時,誤差積累過大,導(dǎo)致支座位移,腹桿與支撐面相碰。
  (8) When the upper chord is supported, the error accumulation is too large, which leads to the support displacement and the web member collides with the support surface.
  04
  04
  門式剛架安裝原因
  Installation reasons of portal frame
 ?。?)較長構(gòu)件運輸、堆放時墊放不平整,長時間放置,導(dǎo)致變形、扭曲。
  (1) When the long components are transported and stacked, the cushion is not smooth, and it is placed for a long time, resulting in deformation and distortion.
 ?。?)預(yù)埋螺栓位置不正,安裝時沒有復(fù)測、沒有校正,導(dǎo)致柱、梁變形、扭曲,鋼架整體垂直度、平面彎曲超差。
  (2) The position of embedded bolts is not correct, and there is no retest and correction during installation, which leads to deformation and distortion of columns and beams, and the overall verticality and plane bending of steel frame are out of tolerance.
 ?。?)梁柱端板孔位不對應(yīng)、錯位,安裝時端板沒有對正,螺栓緊固時沒有按順序緊固。
  (3) The hole positions of beam and column end plates are not corresponding and misplaced, the end plates are not aligned during installation, and the bolts are not tightened in sequence.
 ?。?)現(xiàn)場焊接時沒有按焊接規(guī)程操作或焊工技術(shù)問題,導(dǎo)致焊縫不飽滿或有氣泡、夾渣、微裂縫。
  (4) The welding seam is not full or there are bubbles, slag inclusion and micro cracks due to the lack of operation according to the welding procedures or the welder's technical problems.
 ?。?)安裝時沒有詳細(xì)、認(rèn)真領(lǐng)會圖紙,導(dǎo)致個別構(gòu)件位置錯誤。
  (5) The installation did not understand the drawings in detail and carefully, resulting in the wrong position of individual components.
 ?。?)安裝前沒有按工程實際情況制訂詳細(xì)施工方案、進(jìn)行技術(shù)交底,導(dǎo)致工序顛倒等現(xiàn)像。
  (6) Before installation, the detailed construction scheme and technical disclosure were not formulated according to the actual situation of the project, which led to the inversion of working procedures.
 ?。?)施工不按順序進(jìn)行,鋼架沒有形成穩(wěn)定結(jié)構(gòu)進(jìn)行下道工序施工,導(dǎo)致整體失穩(wěn)。
  (7) The construction is not carried out in sequence, and the steel frame does not form a stable structure for the next construction process, which leads to the overall instability.
  (8)鋼柱剛接插入式柱基時,混凝土達(dá)不到強度或柱腳固定不牢,進(jìn)行上部構(gòu)件安裝,導(dǎo)致結(jié)構(gòu)失穩(wěn)。
  (8) When the steel column is rigidly connected to the plug-in column base, the concrete cannot reach the strength or the column base is not fixed firmly, so the upper component is installed, which leads to the structural instability.
  以上是濟南輕型鋼結(jié)構(gòu)對常見質(zhì)量事故及原因分析,想要了解更多相關(guān)內(nèi)容請繼續(xù)關(guān)注我們的http://網(wǎng)站。
  The above is the common quality accident and cause analysis of Jinan light steel structure. If you want to know more about it, please continue to pay attention to our http:// Website.
亚洲综合另类小说色区色噜噜| 欧美xxxx888| 托克托县| 婷婷五月在线影院| 加勒比中文字幕综合在线视频精品| 青青草原视频亚洲天堂网| 国产区久久| 欧美性爱大香蕉| 国产亚洲AV无码精品| 婷婷导航三区四区| 国产一级揄自揄精品视频| 色哟哟网站入口在线观看| 香人超碰| 亚洲va天堂va国产va久| 欧美一区二区三区在线| 国产一区二区三区四区五区加勒比| 麻豆一区二区三区蜜桃免费| 中文字幕区女二区妖一女一一| 日韩两个人的免费在线视频| 99久久久精品免费欢看国产| 日本一码二码三码是什么尺码| 龙岩市| 免费牲交视频| 青青草中文字幕在线| 色综合天天综合网天天狠天天| 五月国产综合网| 日韩V精品v无码一区二区| 日韩性色Av| 久色av| 成人国产精品| 成人婷婷一区| 亚洲欧美日韩综合在线观看| 国精产品一区一区三区有限| 国产中文字幕在线观看中文字幕| 两性白浆精品国产| 欧美zc0o人与善交| 青青草91久久久久久久久| 你懂的网址中文字幕日本| 国产区亚洲区欧美区| 亚洲cr在线综合导航| 国产精品久久国产精品99盘|