黑人巨大vs小早川怜子,久久精品国产亚洲AV下载软件,日韩黄片一区二区,久久3

銷售咨詢熱線
15953126901
18615254757
行業(yè)動態(tài) dongnews
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟南燕翔鐵藝制品有限公司
  • 手機:15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
當(dāng)前位置: 首頁 > 新聞資訊>行業(yè)動態(tài)焊接在鋼結(jié)構(gòu)工程施工中的地位是很重要的

焊接在鋼結(jié)構(gòu)工程施工中的地位是很重要的

來源:http:// 日期:2024-06-27 發(fā)布人: 瀏覽次數(shù):1

鋼結(jié)構(gòu)的焊接,我們在實施過程中,應(yīng)事先了解哪些具體內(nèi)容,這樣操作起來才不于出錯,這也是焊接人員,在對無錫鋼結(jié)構(gòu)進行焊接時,非常關(guān)心的。因此為了更好普及這些知識:

In the process of welding steel structures, we should first understand the specific content so that we can operate correctly. This is also a concern for welding personnel when welding Wuxi steel structures. Therefore, in order to better popularize this knowledge:

1.作業(yè)條件

1. Homework conditions

(1)要對圖紙很熟悉,并做好焊接技術(shù)交底工作。

(1) Be familiar with the drawings and do a good job in welding technology disclosure.

(2)在施焊前,應(yīng)檢查焊工的上崗證是否在有效期限內(nèi),是否能擔(dān)當(dāng)焊接工作。

(2) Before welding, it is necessary to check whether the welder's work permit is valid and whether they are capable of performing welding work.

(3)現(xiàn)場供電條件,應(yīng)符合焊接用電要求。

(3) The on-site power supply conditions should meet the requirements for welding electricity.

(4)如果施工溫度低于零攝氏度,那么應(yīng)行預(yù)熱,然后再進行操作。

(4) If the construction temperature is below zero degrees Celsius, preheating should be carried out first before operation.

2.冬期低溫焊接

2. Winter low-temperature welding

(1)采用電弧焊時,如果環(huán)境溫度低于零攝氏度,那么應(yīng)對焊接工藝參數(shù)進行適當(dāng)?shù)恼{(diào)整,并遵守常規(guī)的焊接規(guī)定。此外,焊縫和熱影響區(qū)的冷卻,應(yīng)緩慢進行。

(1) When using arc welding, if the ambient temperature is below zero degrees Celsius, the welding process parameters should be adjusted appropriately and conventional welding regulations should be followed. In addition, the cooling of welds and heat affected zones should be carried out slowly.

(2)如果風(fēng)力超過規(guī)定,那么應(yīng)采取擋風(fēng)措施。

(2) If the wind exceeds the prescribed limit, windproof measures should be taken.

(3)焊接后未冷卻的接頭,應(yīng)避免與冰雪相接觸。

(3) The joints that have not been cooled after welding should avoid contact with ice and snow.

(4)為了防止產(chǎn)生焊接裂紋,對鋼結(jié)構(gòu)焊接時應(yīng)進行預(yù)熱,并控制好層間溫度。

20230223071627552.jpg

(4) In order to prevent welding cracks, preheating should be carried out during steel structure welding, and the interlayer temperature should be controlled well.

3.質(zhì)量標(biāo)準(zhǔn)

3. Quality standards

(1)鋼結(jié)構(gòu)焊接工程的檢驗的劃分,分分為若干個批次,分批進行檢驗。

(1) The inspection of steel structure welding engineering is divided into several batches and conducted in batches.

(2)對于碳素結(jié)構(gòu)鋼,在焊接完成后24小時內(nèi),要進行焊縫探傷檢驗。

(2) For carbon structural steel, weld seam inspection must be conducted within 24 hours after welding is completed.

4.應(yīng)注意的質(zhì)量問題

4. Quality issues to be noted

(1)焊接部位的相對尺寸和位置,應(yīng)嚴格進行控制,準(zhǔn)確無誤后才能進行焊接,焊接時也要精心認真準(zhǔn)確進行操作。

(1) The relative size and position of the welding area should be strictly controlled, and welding can only be carried out after accuracy is ensured. During welding, careful and accurate operation should also be carried out.

(2)焊接過程中,不能突然中斷,不能使用大的電流,以防產(chǎn)生焊接裂紋。還有,焊縫接頭上,應(yīng)搭接10到15mm。

(2) During the welding process, sudden interruption and high current should not be used to prevent welding cracks. Also, on the weld joint, it should be overlapped by 10 to 15mm.

(3)焊件在焊接過程中,不能被移動、搬動,或者是被敲擊。

(3) During the welding process, the welded parts cannot be moved, moved, or struck.

久久久国产成人噜噜噜噜| 亚洲 日韩 欧美 一区二区三区| 人人爽人人干| 久久久久A级| 中文字幕极品夜夜| 涩涩视频麻豆| 免费观看成人AV| 91精品福利| 91看黄色片| 狠狠人妻久久久久久综合| 久久国产成人| 亚洲国产精品久久久久久无码| 欧美日本| 亚洲av男人天堂| 亚洲日韩欧美合集| 婷婷丁香五月激情| 成人午夜网| 欧美久久中文字幕| 中国电影网| porny九色| www.久久精品| 久久久伦理| 亚洲AV无码乱人伦在线| 狠狠干不卡| 久久无码看片| 久久久久久亚洲天堂| 五月天色播欧美一级| 亚洲高清五码视频| 亚州综合视频| 在线超碰| 午夜一区二区三区| 伦理片电影网| 四虎影视在线播放| 国产亚洲精久久久久久蜜臂| 日本精品一本区域久久| 色呦呦视频免费在线观看| 欧美亚州一区| 精品三级AV无码一区| 国产黄片视频| 国产亚洲欧美第三区| 亚洲天堂欧美日韩|